. Home Ricerca ReLUIS-DPC 2014-2018 RINTC

reluis

RINTC(-E) PROJECT 2015-2018


 RINTC(-E) - a joint ReLUIS-EUCENTRE research project to assess the (implicit) seismic risk of code conforming structures in Italy.
1. Project briefs

RINTC, which started in 2015, is a joint project of ReLUIS and EUCENTRE. The goal of the project is to assess in an explicit manner the seismic risk of structures designed according to the code (currently enforced and older) in Italy. To this aim five structural typologies were considered:

  • masonry buildings,
  • reinforced concrete buildings,
  • pre-cast reinforced concrete industrial buildings, 
  • steel industrial buildings, 
  • seismically isolated buildings.

In the framework of the project, multiple archetype structures have been designed for each typology according to standard practice at five sites across Italy, spanning a wide range of seismic hazard levels:

  • Milano,
  • Caltanissetta,
  • Roma,
  • Napoli,
  • L'Aquila,
  • Catania.
The seismic vulnerability of the designed structures was assessed by subjecting 3D computer models to multi-stripe non-linear dynamic analysis. Integration of the probabilistic hazard and probabilistic vulnerability (i.e., fragility) yielded the annual failure rate, in terms of onset of non-structural damage and collapse, of each of the structures. Risk assessment takes into consideration record-to-record variability of non-structural response and, for selected cases, structural modeling uncertainty.

2. Project structure

The project is structured in seven work-packages, as follows:
  • WP1: Coordination, probabilistic hazard assessment, seismic input definiution for nonlinear dynamic analysis of structures, and evaluation of failure rates for the analyzed structures;
  • WP2: design, modeling, and non-linear dynamic analysis of masonry structures;
  • WP3: design, modeling, and non-linear dynamic analysis of pre-cast reinforced concrete structures;
  • WP4: design, modeling, and non-linear dynamic analysis of reinforced concrete structures;
  • WP5: design, modeling, and non-linear dynamic analysis of steel structures;
  • WP6: design, modeling, and non-linear dynamic analysis of base-isolated builginds;
  • EU: focus group on consideration of modeling uncertainty.
  • SLD: focus group on failure rates for damage-limitation limit state. 

3. Working group

The working group is large and involves researchers specialized in seismic risk assessment and in seismic structural analysis and desing. Below the research unit leaders, their role in the project and their institutions.
  • WP1 (coordination): Iunio Iervolino (Università degli Studi di Napoli Federico II), Paolo Bazzurro (Istituto di Studi Superiori di Pavia);
  • WP2 (masonry): Guido Magenes and Andrea Penna (Università degli Studi di Pavia), Sergio Lagomarsino (Università degli Studi di Genova), Francesca Da Porto (Università degli Studi di Padova);
  • WP3 (pre-cast reinforced concrete): Gennaro Magliulo (Università degli Studi di Napoli Federico II), Roberto Nascimbene (EUCENTRE); Paolo Riva (Università degli Studi di Bergamo); Fabio Biondini (Politecnico di Milano);
  • WP4 (reinforced concrete): Paolo Franchin and Fabrizio Mollaioli (Sapienza Università di Roma), Angelo Masi (Università degli Studi della Basilicata), Enrico Spacone (Università delgi Studi di Chieti-Pescara G. D'annunzio), Gennaro Magliulo and Gerardo Verderame (Università degli Studi di Napoli Federico II);
  • WP5 (steel): Raffaele Landolfo and Gaetano Della Corte (Università degli Studi di Napoli Federico II), Andrea Dall’Asta e Alessandro Zona (Università degli Studi di Camerino);
  • WP6 (base-isolation): Donatello Cardone and Felice Ponzo (Università degli Studi della Basilicata), Andrea Dall’Asta (Università degli Studi di Camerino);
  • WP7 (existing buildings): all;
  • Other workgroup members: Guido Camata, Serena Cattari, Francesca Celano, Maddalena Cimmino, Gaetano Della Corte, Francesca da Porto, Giovanni Guidi, Vincenzo Manfredi, Claudio Modena, Fabrizio Noto, Paolo Ricci, Fabrizio Scozzese, Andrea Spillatura, Giusy Terracciano, Marco Terrenzi; Georgios Baltzopoulos; Akiko Suzuki; Andrea Belleri; Bruno Dal Lago. 
  • Civil protection reference persons for the project: Agostino Goretti, Mauro Dolce and Claudio Moroni.

4. 2018 milestone meetings
  • April 18th - Rome
  • July 18th - Rome
  • October 3rd - Rome
  • December 12th - Rome

5. Project reports

Ultimo aggiornamento ( Martedì 29 Maggio 2018 13:56 )  

Area riservata